Compliance Checks
← Compliance Checks
Budget must include matching funds of at least 20% of total project cost.
Requirement MetGA-1035 · California Energy Grid Resilience and — Ridgeway
Check
- Application
- California Energy Grid Resilience and — Ridgeway
- Requirement
- Budget must include matching funds of at least 20% of total project cost.
- Checked Item Type
- Scope Doc
- Checked Item
- —
Result
- Status
- Requirement Met
- Verified By
- Human Verified - Internal
- Notes
- Checked the budget narrative against the match funding requirement — 22% documented.
- Last Updated
- Jul 14, 2026
Requirement Source
- Found In
- NOFO.pdf p23 para4
- Weight
- 4
- Due
- —
- Source Sentence
- “Applicants shall demonstrate non-federal cost share of not less than twenty percent (20%) of total eligible project costs.”
No audit history.
